Open Questions

Every investigation on this site ends the same way: with a question put to the body that holds the answer. This page gathers those questions in one place, names who each one is for, and records where it stands. We are submitting them formally, and we will publish whatever comes back, in full, beside the question it answers.

What the status means

  • Preparing, the question is set out in our reporting and we are preparing to put it formally to the body named.
  • Awaiting response, a formal request has been filed and the statutory clock is running. We show the date filed and the date a reply is due. For AGC, a company with no statutory duty to reply, it means the question has been put in writing and no reply has yet come; there is no due date.
  • Answered, a reply has been received; we link it and, where needed, respond to it.
  • Partly answered, some points were addressed and others declined. We say which.
  • No response, the reply-by date passed with no substantive answer.

Nothing here is an accusation. These are requests for information and for comment, of the ordinary kind any public body should expect. The record simply shows which have been asked, which answered, and which not.


Open requests at a glance

Updated 13 November 2026. Each formal request that is still open, who holds it, and when a reply is due. Requests filed through WhatDoTheyKnow are linked, so the replies are public as they arrive.

With What it asks Filed Their reference Reply due Status
Health and Safety Executive The October 2024 fire: RIDDOR report, enforcement, COMAH tier, substances involved 5 Aug 2026 202602243 4 Sep 2026 (passed) No substantive reply. Reported to the Information Commissioner’s Office on 28 Sep 2026, case IC-573871-P5Y8. Holding reply on 19 Oct 2026, citing a problem with a supplier’s system; no date given. Internal review requested on 18 Oct 2026; no reply other than that holding reply is recorded as at 11 Nov 2026
Environment Agency The air dispersion model AQMAU-C2478-RP02, the Phase 2 and 3 sampling design, sample locations and results, and the sampling depth 29 Sep 2026 EIR2026/46693 27 Oct 2026 (reply received 22 Oct) Partly answered on 22 Oct. The EA says it does not hold RP02 and sent RP03 (whose cover page gives a response date of 5 April 2024). It withheld its plans showing average soil concentrations against the model’s predicted deposition pattern, as personal data (regulation 13). For the sampling design, sample locations and depth it pointed to the published Phase 1 to 3 reports. On 22 Oct we asked the EA, on the same thread, for an internal review of its answers on RP02, sensitivity analysis, the sampling design and the withheld plans, and made further requests; both are in the next two rows
Environment Agency Internal review of its answers on the dispersion model RP02, the sensitivity analysis, the sampling design and the withheld plans 22 Oct 2026 IR2026/51684 21 Dec 2026 (the Agency’s own date) Awaiting response. Acknowledged 27 Oct. We added a further request on the same thread on 30 Oct 2026; if it is handled as a new request, a reply is due by 27 Nov 2026 (our calculation, 20 working days)
Environment Agency Further requests on the same thread: how the 5 km, 500 m and 1 km limits were chosen, model settings and inputs, weather data, buildings 22 Oct 2026 EIR2026/52524 19 Nov 2026 (the Agency’s own date; our count of 20 working days gives the same) Awaiting response. The Agency is handling these as a new request and acknowledged them on 2 Nov
Environment Agency Internal review of its answers to the fire request: the “not held” answer on monitoring, the assessment of substances released, and the incident record, including its closure information 21 Oct 2026 IR2026/50959 17 Dec 2026 (the Agency’s own date) Awaiting response. Acknowledged 22 Oct
Environment Agency Current PFOA releases from the site: permit limits and monitoring requirements, AGC’s results under the Regulation 61 notice, the basis of the “few tens of grams per year” figure, the Agency’s own PFOA sampling, Pollution Inventory entries, and whether the Part 2A inspections cover releases after 2012 3 Nov 2026 EIR2026/53576 and EIR2026/53951 (the Agency acknowledged the request twice, on 6 and 10 Nov) 2 Dec 2026 (our calculation, 20 working days; the Agency’s acknowledgements give 2 Dec and 7 Dec) Awaiting response
Defra Meetings between Defra and AGC Chemicals Europe (Hillhouse) from 1 October 2023, what was recorded of them, and the titles and dates of the documents about them 22 Oct 2026 EIR2026/24312 19 Nov 2026 (our calculation; replied 10 Nov) Partly answered on 10 Nov 2026. Defra listed four contacts with AGC: online meetings on 20 Nov 2025 (“Implementation of Long Chain PFCAs into UK POP”) and 4 Jun 2026 (“Long chain PFCAs consultation follow up”), a phone call of 8 minutes on 13 Aug 2026 and an online meeting of 15 minutes on 9 Sep 2026 (Defra’s reply and its list of meetings, Annex C). Annex C gives the invite list for the two online meetings on long-chain PFCAs as “AGC, Defra Official and KREAB”, and records the other two contacts as between AGC and a Defra official; it does not say who attended the two meetings on long-chain PFCAs. Kreab describes itself as a strategic communications and public affairs consultancy. Its entry on the EU Transparency Register (ID 1078390517-54) lists AGC Chemicals Europe among its clients for the financial year 2025, under “REACH”, the EU chemicals regulation (LobbyFacts copy of the register entry as it was on 9 Nov 2026). That register covers lobbying of EU institutions; we could not check the UK Register of Consultant Lobbyists. Defra says that, after searching its paper and electronic records, it holds no minutes, notes or briefings for these meetings that concern emissions or contamination from the site (regulation 12(4)(a)). It withheld the titles, dates and producers of the documents about the meetings (part 5 of the request) under regulation 12(5)(e) (confidentiality of commercial or industrial information) and regulation 12(5)(f) (interests of the person who provided the information), and some third-party personal data under regulations 12(3) and 13. An internal review of the part 5 withholding was requested on 11 Nov 2026; Defra’s reply is due by 13 Jan 2027 (our calculation, 40 working days)
Wyre Council The law relied on for not sampling gardens on request, the sampling design, properties that declined or were substituted, and requests received 29 Sep 2026 FOI003977 27 Oct 2026 (our calculation, 20 working days; passed) No substantive reply by the due date. Acknowledged 29 Sep; reminder sent 28 Oct 2026; internal review requested 4 Nov, which the council declined on 5 Nov on the ground that it does not carry out internal reviews where a response has yet to be provided. Reported to the Information Commissioner’s Office on 5 Nov 2026, case IC-593157-P7L7
Lancashire County Council The figures behind the kidney cancer assessment, and the comparison populations used 28 Sep 2026, by email FOI1643 23 Nov 2026 (extended by LCC on 22 Oct under regulation 7 of the EIR; the earlier date was 26 Oct, our calculation) Awaiting response, acknowledged 29 Sep. LCC says the request is complex and that it will respond before the new deadline if it can
Wyre Council WSP’s roles: its appointment for the Masterplan Review, any declaration of its Part 2A work for the Environment Agency, and any conflict-of-interest consideration 22 Oct 2026 (no reference yet) 19 Nov 2026 (our calculation, 20 working days) Awaiting response
Environment Agency The Jameson Road landfill, Fleetwood: the original waste licence (54096) and any earlier licence, who held it and when, when tipping began, the records behind the Historic Landfill entry “18 Acre Tip”, the Agency’s response to its 2023 enquiry on fluoropolymer manufacturers (cited by Dalmijn et al., 2025), and whether it holds any records of waste from AGC being sent to the site 10 Nov 2026 EIR2026/54440 9 Dec 2026 (our calculation, 20 working days; the Agency gives the same date) Awaiting response
Lancashire County Council The Jameson Road landfill, Fleetwood: the planning applications and consents for tipping before application 02/99/0704, with applicants, decision notices and conditions, and the waste disposal licence records the council holds from its time as a waste regulation authority 10 Nov 2026 FOI1977 9 Dec 2026 (our calculation, 20 working days) Awaiting response
Wyre Council The Jameson Road landfill: the lease commencing 1 January 1999 that the council’s Cabinet report of 16 January 2019 calls the original, any earlier leases, licences or agreements for the land, and the report and minute of the Cabinet meeting of 24 September 2014 that considered amending that lease 10 Nov 2026 FOI004176 9 Dec 2026 (our calculation, 20 working days) Awaiting response. Acknowledged 12 Nov; the council gave no due date
Environment Agency The choice of PFAS analytes for the soil and egg sampling in Phases 1 to 3 of the Part 2A inspection, including EEA-NH4: the instructions that set the analytes, any record of the decision to use the laboratory’s “PFAS Broad Suite” for the soils and a four-compound suite for the eggs, whether any substance other than PFOA was treated as a contaminant of concern, whether adding EEA-NH4 was considered, and any results for EEA-NH4 in sampling the Agency commissioned or carried out 13 Nov 2026 (no reference yet) 14 Dec 2026 (our calculation, 20 working days; WhatDoTheyKnow gives the same date) Awaiting response. WSP’s factual reports for Phases 1 to 3 record that the soil samples were analysed for the laboratory’s “PFAS Broad Suite”. We searched the analyte lists in the published laboratory certificates for Phases 1 to 3 and did not find EEA-NH4 or its acid form, EEA

Answered and moved out of this table: the Wyre Council accessibility complaint and request for searchable PDFs (filed 9 October, answered 16 October 2026, complaint upheld). Its record is under Other bodies, with the other answered requests.


The three fire requests: two answered, one now overdue

Three Freedom of Information and Environmental Information requests were filed on 5 August 2026. All three test specific statements AGC Chemicals Europe has now put on the public record about the October 2024 fire. Each was filed through WhatDoTheyKnow, so the request, the reply and any refusal are public as they happen. You do not have to take our word for any of it.

Two were answered on 2 September 2026. The Environment Agency and Lancashire Fire and Rescue Service both replied within the statutory period, and both disclosed substantive material. We say so here as prominently as we would report a refusal.

We previously showed all three as due by 2 September. That was our arithmetic error, not theirs: it counted twenty straight weekdays and missed the summer bank holiday on 31 August, which is not a working day. Twenty working days from 5 August falls on 3 September. Both replies arrived inside the deadline on either calculation. HSE’s own reply-by date is a day later still, 4 September, because it recorded the request as received on 6 August rather than 5 August. Where a body states its own deadline, we use that date rather than ours.

Filed with What it asks Status
Health and Safety Executive The RIDDOR report for the fire, HSE’s response to it, whether any enforcement action was taken, the site’s COMAH tier on the day, and any record of the substances involved No response. Filed 5 Aug 2026. HSE recorded receipt on 6 August and set its own reply-by date of 4 September 2026. Acknowledged on 5 and 7 August; both were acknowledgements only. We asked for an update on 7 September. HSE’s automated reply that day states it is “currently experiencing an increased volume of information requests” and that this has resulted in it “not always being in a position to respond to requests within the statutory deadlines”. Sixteen working days overdue as at 28 September 2026, with no substantive reply. Reported to the Information Commissioner’s Office on 28 September 2026 (case IC-573871-P5Y8). On 19 October 2026 HSE sent a holding reply: it is “currently experiencing issues with a third-party service provider that supports a system to process information requests”, the request remains open and it will respond “as soon as possible”. No date was given. We sent the holding reply to the Information Commissioner’s Office the same day. We had asked HSE for an internal review on WhatDoTheyKnow on 18 October 2026; no reply other than the holding reply is recorded as at 11 November 2026.
Environment Agency Notification received from AGC, any pollution incident record, any air, water or soil monitoring done around the fire and its results, enforcement action, and correspondence with the company Partly answered, 2 Sep 2026, reference EIR2026/37608. Eight documents disclosed, including the incident record, two compliance assessment reports and AGC’s own statutory notifications. The monitoring question was refused as “not held”. We asked for an internal review on 21 October 2026, covering that answer, the assessment of substances released and the incident record (Environment Agency reference IR2026/50959); the Agency’s own date for its decision is 17 December 2026.
Lancashire Fire and Rescue Service The full incident record for 2410007359, what was recorded as burning, whether hazmat resources attended, whether breathing apparatus was used, and whether any advice was issued to residents Answered, 2 Sep 2026. The full narrative log and incident report were released. The Service answered the residents question directly.

Why the fire service request mattered most, and what it returned. AGC declined to say whether residents were warned, on the basis that it would not comment on the operational decisions of the emergency services. That made it a question only Lancashire Fire and Rescue could answer. They answered it:

“No advice was given at the time of the incident to residents or businesses as it did not meet the call out parameters of the media liaison officer.”

We are preparing a further request to the Service asking for those call out parameters, for any record of warning and informing being considered on the night, and for its arrangements as a Category 1 responder under the Civil Contingencies Act 2004.

What we are asking next

These are drafted and not yet filed. We list them here before they go, so that the record shows what was asked and when, and so that anyone can watch the replies arrive on WhatDoTheyKnow.

To be filed with What it will ask Status
Lancashire Fire and Rescue Service The call out parameters for the media liaison officer as they stood on 19 October 2024; any record of warning or informing the public being considered for this incident; the Service’s warning and informing arrangements as a Category 1 responder under the Civil Contingencies Act 2004; and any lead responder designation by the Lancashire Resilience Forum Preparing
Environment Agency Whether the action required by 25 March 2025 was complied with; any Compliance Assessment Report for this permit issued on or after 1 April 2025; and whether the C3 breach was closed out, escalated or carried forward Preparing
Wyre Council Any report or record identifying who carried out the sampling and analysis for AGC’s voluntary on-site investigation, and whether that work was undertaken by the operator or by a third party Preparing
British Transport Police Which railway was identified as close to the incident on 19 October 2024, and whether it was carrying traffic that day Preparing

Why these are spaced out rather than filed together. A public authority may treat similar requests from the same person as a single, aggregated request and refuse the lot as manifestly unreasonable. Filing several at one body in quick succession risks losing the material rather than merely delaying it. So requests to the same body are spaced by weeks, and requests to different bodies run in parallel.

Each asks for documents, not explanations. A request for a record can be answered. A request for a reason can lawfully be declined as a request for opinion. Each also invites the body to confirm plainly where it holds nothing, so that a nil answer is itself informative.

Why we are asking regulators to confirm what the company has already told us. AGC has stated that it informed both the HSE and the Environment Agency, and that no enforcement action followed. A company’s account of its own regulation is not the same as the regulator’s record of it, and the difference is exactly the sort of thing this site exists to check. The Environment Agency’s record is now disclosed (EIR2026/37608, 2 September 2026): it confirms the Agency was notified on the evening of the fire, and its Compliance Assessment Report BU5453IY/0546209 of 11 March 2025 records a breach of permit condition 1.1.1, categorised C3, with the box ticked for “you have been issued with a warning” and a required action due 25 March 2025. Whether a warning is “enforcement action” turns on the meaning of the term, and the form’s own text lists enforcement action as something that “can include the issue of a formal caution, prosecution, the service of a notice and or suspension or revocation of the permit”. We set both out rather than resolve it. The HSE’s record is still outstanding.


Environment Agency

Question Type Status
Publish the AQMAU-C2478-RP02 air-dispersion model in full, with the wind data, stack height and emission figures behind it, and the basis for the 500 m and 1 km sampling radii and for where Phase 3 soil testing was concentrated. FOI Asked 29 Sep 2026 (EIR, WhatDoTheyKnow), with the Phase 2 and 3 sampling design, any comparison of the model with the soil results, and the reasons for stopping at 0.6 m depth. Partly answered 22 Oct 2026: the EA says it does not hold RP02 and sent RP03; status in the table at the top of this page. Internal review and further information requested 22 Oct 2026
Release the underlying Phase 2/3 residential soil dataset and the map coordinates of every soil sample. FOI / Data Asked 29 Sep 2026, as part of the request above (locations may be generalised to protect individual homes). Partly answered 22 Oct 2026: the EA says the Phase 2 and 3 reports contain the soil results and show approximate locations, and that exact locations are withheld because the samples were taken from private gardens
RP03 lists the south-east, south and west as the directions of predicted peak PFOA concentration and deposition at the site boundary (p.1). The Phase 3 report’s Figure 1 legend lists the south, south-west, west and north-west under “lower risk” (GR04) and the south and south-east under “higher risk” (GR03) (p.49), and its Scope of Work (p.12) describes a wider spacing in the wider area (200 m+ beyond 500 m, against about 50 m in the south-east; within 500 m, Phase 2 used 100 m and 150 m grids). Provide the record of which issue of the model, if any, and what other basis, was used to assign the “lower risk” marking to the south and west. Data Preparing
For the non-PFOA PFAS compounds found in Phase 3 residential soils, has the source been investigated, and can that analysis be shared? Data Preparing
What is the source of the PFOS, PFNA and PFHxS found in eggs near the site? AGC told the BBC it “has never used or manufactured PFOS”; we have found no document that tests that statement. Data Preparing
Is there a route for a resident to have their own garden soil tested, and what criteria selected the 71 properties already tested? Data Partly answered 29 Sep 2026: Wyre Council says it cannot sample in response to individual requests (FAQ). The legal basis, the selection criteria and how many properties declined or were substituted: Asked 29 Sep 2026 (FOI, WhatDoTheyKnow). No substantive reply by the normal deadline of 27 Oct 2026; reminder sent 28 Oct 2026. Internal review requested 4 Nov and declined by the council on 5 Nov; reported to the Information Commissioner’s Office on 5 Nov 2026 (case IC-593157-P7L7)
How do AGC’s IED permit and Thornton Facilities Management’s discharge consents interact, was the split of permit-holders deliberate, and does it leave any gap in PFAS accountability at the point of discharge? FOI Preparing
What are the conditions of discharge consent 017290384 (Royles Brook), which the Environment Agency’s public register shows at version 1 (21 January 1999), and do they include any PFAS monitoring requirement? FOI Preparing
For Hillhouse, give the dates of PFAS detection, council notification and public disclosure, and the reason for any gap between them. FOI Preparing
Why has no public warning sign been placed at the watercourses around the site where Dalmijn et al. (2025) measured PFOA and EEA-NH4, when allotments were closed, on what the council called a precautionary basis, on the soil and produce results? Comment Preparing
The council leader’s report of 22 October 2026 says the Agency has commissioned sampling of “a small number of local public open spaces” for EEA-NH4. Publish the results, with the sampling dates, the places sampled and the detection limits, and say whether EEA-NH4 will be tested in the Phase 4 garden sampling (what the report says). FOI Preparing
Whether AGC has applied to surrender permit EPR/BU5453IY; what the site condition report must show and what baseline “the state of the site before the facility was put into operation” means for a site used industrially since the 1950s; and whether any surrender application will be published for comment. Data Preparing

Wyre Council

Question Type Status
From which boundary, and from what point on it, is the 1km advisory zone measured, and will a map of it now be published with the methodology and scientific basis? Data / FOI Preparing
Which authority owns responsibility for defining the 1km advisory zone, the Council or the Environment Agency? Comment Preparing
Which body decided to decline blood testing for residents, was a clinical risk assessment carried out first, and was the Council Leader consulted on the FOI response that set this out? FOI Preparing
What specifically makes biomonitoring “not appropriate” at a site where Wyre Council says the Environment Agency has concluded that land meets the Part 2A contaminated-land criteria for PFOA in produce? Comment Preparing
On what basis were properties described as “high risk” (seven of the 71 tested, according to Leigh Day citing the BBC), and how many properties exceeded the CL:AIRE interim Category 4 Screening Levels for PFOA, 7.6 µg/kg for residential land with home-grown produce and 1.4 µg/kg for allotments? Data Preparing
What criteria would a residential property near Hillhouse need to meet for a formal Part 2A designation? Comment Preparing
When will Wyre Council complete the liability assessment for the Occupation Road and Sandringham Avenue allotments, determined as contaminated land on 22 October 2026, and begin the minimum three-month consultation? Comment Preparing
Will the Council use its Town and Country Planning Act powers for new applications near the site, and has it taken legal advice on PFAS planning conditions? Comment Preparing
Why has the investigation been described as scoped to historic atmospheric deposition of PFOA from a single emission point (one attender’s account of the 12 March 2026 drop-in), when the permit lists 15 air-emission points and the site also discharges to the River Wyre? Comment Preparing

Lancashire County Council / Multi-Agency Health Cell

Question Type Status
Release the full figures behind the kidney-cancer assessment, case counts, expected counts, SIRs and confidence intervals by small area, so the “no further investigation” conclusion can be independently reviewed. Data / FOI Asked 28 Sep 2026 (FOI, by email; LCC reference FOI1643), together with the comparison populations used in the report’s second stage. Reply due 23 Nov 2026 (extended by LCC on 22 Oct under regulation 7 of the EIR; the earlier date was 26 Oct, our calculation)
Your public statement omits the report’s own observed and expected counts, its SIRs (218 and 181), its confidence intervals and its “statistically significant” designation of two areas. Why were these left out, and do you accept that characterisation? Comment Preparing
Your statement of 15 June 2026 says environmental information “was used for contextual comparison only and not to assess individual exposure or causation,” and also that there is “no indication of a link to environmental contamination.” On what basis did you conclude there was “no indication of a link”, if the environmental information was not used to assess causation? Will you commission an assessment that does assess it? Comment Preparing
Was the distance test cross-checked against the soil results by direction as well as by distance, given that the highest garden result in WSP’s Phases 2 and 3 (181 µg/kg) lies to the south-east, the direction of the area with an excess against England’s rates that the Health Cell deemed statistically significant? Comment Preparing
Given cancer latency, and that registration records the address at diagnosis rather than at exposure, what confidence attaches to a “no gradient” finding? Comment Preparing
The report says the rate in LSOA E01025596 “was higher than the England average” but “statistically similar to those in most other LSOAs”. Which small areas were in that comparison, could they share the same exposure, and could comparing against them mask a real excess? Comment Asked in part 28 Sep 2026, in the FOI above: which comparison populations were used, their rates against England, and the results. Reply due 23 Nov 2026 (extended by LCC on 22 Oct under regulation 7 of the EIR; the earlier date was 26 Oct, our calculation). Preparing: whether those areas could share the same exposure, and whether comparing against them could mask a real excess.
Has any assessment been made of PFOA’s non-cancer harms against local health data, and if so where is it published? Data Preparing
Will blood testing be commissioned for residents, applying the reference values already used at Bentham and by the Jersey panel? Data Preparing

UK Health Security Agency

Question Type Status
What guidance did UKHSA provide that informed the Council’s position declining blood testing? Data Preparing
Did UKHSA, the Food Standards Agency and the Drinking Water Inspectorate receive the Environment Agency’s 2022 PFAS data for these sites, and what did each do with it? FOI Preparing

AGC Chemicals Europe

The October 2024 fire is recorded in AGC’s own FY2024 accounts, filed at Companies House on 8 September 2025 (company 03825057): “The business experienced a fire in October 2024 within the Steam Pyrolysis section of the plant. This caused an outage of 3 months.” A separate note records an incident on 19 October 2024 and an insurance claim for lost income. Lancashire Fire and Rescue Service incident 2410007359 logs a commercial building fire on Fleetwood Road North at 16:50 that day, naming no operator or site. AGC confirmed the fire in its reply to us of 22 July 2026. See our analysis of the accounts for the full record.

AGC replied on 22 July and again on 4 August 2026, asking to be attributed to “an AGC Chemicals Europe, Ltd. spokesperson” and confirming its response was “developed by an internal team and approved by our Directors”. Both replies are published in full on the two articles below.

On 14 October 2026 we put six questions to AGC in writing, in our wording, first set out on 6 August 2026. Their status is in the table: four are new rows, and two were already listed and have now been put again.

Question Type Status
What burned in the October 2024 fire, what was released, and was the surrounding air monitored during the fire and its three-month aftermath? Data Declined, put twice. Now asked of the regulators instead. Put again in writing on 14 Oct 2026, as “What burned in the October 2024 fire, what came off the site, and was the surrounding air monitored during it and its aftermath?”: Awaiting response
Did the fire service issue any advice to residents at the time? Data Declined. Now asked of Lancashire Fire and Rescue
“Why was the public not informed of a fire that shut a major-hazard chemical plant on a residential boundary for three months?” (our wording as put to AGC. The Health and Safety Executive’s public COMAH register, checked 14 October 2026, lists the site as a lower-tier establishment; we have asked the HSE for its status on the day of the fire, above) Right of reply Declined, put twice. Put again in writing on 14 Oct 2026, as “Why were residents not informed that the fire was at a major-hazard chemical site on their boundary?”: Awaiting response
Was the fire reported to the HSE and the Environment Agency? Right of reply Answered 22 Jul. Both were informed, and AGC states no enforcement action was taken. Being verified with both regulators
Why was the plant down for three months? Right of reply Answered 22 Jul. Fire damaged equipment and pipework critical to manufacturing; long replacement lead times
Does AGC dispute any figure, quote or characterisation in our analysis of its closure, given every figure is drawn from AGC’s own audited accounts? Right of reply Answered 22 Jul. AGC does not dispute the figures: “You are quite right that our Companies House accounts show a profit for some of these years”
How does the single principal activity in the accounts relate to the two business units AGC describes? Right of reply Partly answered 4 Aug. Explanation supplied: both are internal business units within that one activity; the unit figures are confidential and not independently verified
Which legal entity carries on the Amsterdam resale business, and under what registration? Right of reply Partly answered 4 Aug. Confirmed as a business unit of AGCCE, not a separate company. No registration or address given
Will AGC provide the turnover split between the Amsterdam resale business and the Hillhouse manufacturing site? Data Declined 4 Aug, on commercial confidentiality. Provided to unions and employee representatives only
Will AGC confirm the name and capacity of its spokesperson? Housekeeping Declined. Corporate attribution only
Does AGC accept that the elevated PFOA levels identified through the Environment Agency’s investigation are attributable to the company? Right of reply Awaiting response. Put in writing 14 Oct 2026
What is AGC’s position on remediation? Right of reply Awaiting response. Put in writing 14 Oct 2026
What support does AGC intend to offer the local population in relation to the impacts of PFOA? Right of reply Awaiting response. Put in writing 14 Oct 2026
What does the decommissioning plan for the site involve, and what budget has been set aside for it? Right of reply Awaiting response. Put in writing 14 Oct 2026
Has AGC applied, or does it intend to apply, to surrender the Hillhouse environmental permit, and what is the timetable after production is expected to end by 31 December 2026? Right of reply Preparing

WSP (the Environment Agency’s contractor)

Question Type Status
The “About the Authors” page is fully redacted, yet the PDF metadata names an author. Confirm the lead author and explain why the page was redacted. Comment Preparing
Was one panel of the report’s key soil chart generated by an AI tool, and if so what checks were run against the source data before publication? Data Preparing
What were the actual PFAS concentrations in the 13 field-blank samples that exceeded the lab detection limit, and how were they judged “not significant”? Data Preparing
The report says the wider inspection covers “other linkages of concern,” including risk to the water environment, but never elaborates. Specify what they are and where and by whom they are being assessed. Data Preparing

Other bodies

Question Type For Status
Was the October 2024 fire reported to the HSE, what did HSE do about it, and was any enforcement action taken? FOI Health and Safety Executive No response, due 4 Sep 2026. Reported to the Information Commissioner’s Office on 28 Sep 2026. Holding reply 19 Oct 2026, no date given. Internal review requested on WhatDoTheyKnow 18 Oct 2026; no further reply recorded as at 11 Nov 2026
What does the fire service’s own record of incident 2410007359 show, and were residents warned? FOI Lancashire Fire and Rescue Service Answered, 2 Sep 2026
Was the Food Standards Agency notified of the egg-testing findings, and what action did it take? FOI Food Standards Agency Preparing
Why are the Phase 1 technical report (461 pages), the Phase 2 factual report and the Occupation Road interpretative report published on the council’s website only through an embedded Issuu viewer, which cannot be searched or downloaded, when the Phase 3 and Sandringham Avenue reports are ordinary PDF downloads? Accessibility complaint under the 2018 regulations, and request under regulation 6 of the Environmental Information Regulations for searchable PDFs Complaint and EIR request Wyre Council Answered (16 Oct 2026). Phase 2 report removed from the council’s website (22 Oct 2026); a changed version linked again (11 Nov 2026). Sent by email on 9 Oct 2026 (not on WhatDoTheyKnow). On 16 Oct 2026 the council upheld the complaint at Stage 1 (ref ONE000291). Its letter says the concern “was justified” and apologises that it “was not resolved when you first raised it in March 2026”. The Issuu links were removed and all three reports were published as downloadable, text-searchable PDFs (council files dated 14 and 15 October 2026). On 22 October 2026 the council removed the Phase 2 factual report from its website; its contaminated-land guide listed it as “currently under review”, with no link, until 11 November 2026, when the guide linked a Phase 2 factual report again: 353 pages, against 485 in the council’s file dated 14 October 2026 (server record), with the sample co-ordinates removed and two staff names redacted. The guide gives no reason for the removal, and neither the guide nor the council’s download page gives a reason for the changes. We do not know why the report was removed or changed, and we are trying to find out. The council’s earlier file, which we still hold, and the details of the change are on our Reports page. Other documents on the same page that were linked through third-party software were also changed. In its response dated 16 October 2026, the council said future reports would be published as accessible, downloadable documents “and not through an embedded viewer alone”. The letter says the request for the reports in an accessible electronic format “has therefore also been met”. Our check of the council’s files on 21 Oct 2026 found that parts of them remain inaccessible to assistive technology: many appendix pages (lab certificates, logs and tables) carry no structure tags, one Phase 1 laboratory table (PDF page 456) has no text layer, and one Phase 1 results table shows “below detection” by colour only. The measurements are on the Reports page. The letter says the council’s website has a 24 MB upload limit, so “larger documents may need to be optimised or divided into accessible parts before publication”

This page is updated as questions are submitted and as answers arrive. If you are one of the bodies named here and believe a question is inaccurate or already answered, tell us and we will correct the record.

Corrected 11 October 2026: the entry on the Wyre Council accessibility complaint and information request of 9 October 2026, and the ‘high risk’ wording. See the changelog.

Corrected 22 October 2026: the Environment Agency row about a second peak to the west-north-west is replaced by a question about the “lower risk” marking for the south and west, against the model report RP03; the Health Cell row about the distance test no longer refers to “one peak” and “directional findings”; and the Wyre Council accessibility request, answered on 16 October, is moved out of the open-requests table to the Other bodies section. See the changelog.

Updated 11 November 2026: the status of the requests to Wyre Council, the Health and Safety Executive and the Environment Agency; Defra’s reply of 10 November; and new rows for the Environment Agency’s request on current PFOA releases and for three requests on the Jameson Road landfill (Environment Agency, Lancashire County Council, Wyre Council). See the changelog.

Corrected 11 November 2026: the “our calculation” reply dates for the Environment Agency’s request on current PFOA releases (now 2 December 2026, not 1 December), for the three requests on the Jameson Road landfill to the Environment Agency, Lancashire County Council and Wyre Council (now 9 December 2026, not 8 December). We had counted only bank holidays in England; the law counts a bank holiday in any part of the United Kingdom, so Scotland’s St Andrew’s Day (Monday 30 November 2026) and its substitute holiday on 4 January 2027 are not working days either. The dates are recalculated to exclude bank holidays in all parts of the UK, as the law requires. See the changelog.

Corrected 11 November 2026 (evening): the Defra row said Defra holds no minutes, notes or briefings “on emissions or contamination from the site”; Defra’s answer covers only records for the meetings in our request that concern emissions or contamination from the site, after the search it describes, and the row now says so. The row also now gives the invite lists in Defra’s Annex C, which name the consultancy Kreab for two meetings, and links Defra’s reply. The Lancashire County Council row on the Jameson Road landfill gains the council’s reference, FOI1977. See the changelog.

Corrected 12 November 2026: the Wyre Council row on the accessibility complaint said “The council has not given a reason” for removing the Phase 2 factual report. What we can show is that the council’s contaminated-land guide gives none, and the row now says that. See the changelog.

Updated 13 November 2026: new row for our request of 13 November to the Environment Agency on the choice of PFAS analytes for the soil and egg sampling, including EEA-NH4; Wyre Council’s reference (FOI004176) for the Jameson Road lease request, acknowledged on 12 November; the Environment Agency’s reference (EIR2026/54440) for the Jameson Road licence request. See the changelog.